I

Idahome Energy in Boise

Boise, Idaho·Solar Installation
Residential

8+ yrs

Experience

150 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Idahome Energy

Locally owned Boise solar installer founded to fill Idaho's need for a trustworthy, community-focused solar company since 2018

Boise, Idaho 83713

Boise, Idaho 83713

Services Offered

Solar InstallationBattery StorageSolar DesignEV ChargingMaintenanceMonitoringRoof Assessment

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB AccreditedLicensed Idaho ContractorAPsystems Certified

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Silfab

Inverters

APsystems

Batteries

Battery Storage

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Boise, IdahoMeridian, IdahoEagle, IdahoNampa, IdahoCaldwell, IdahoEmmett, IdahoTwin Falls, Idaho

Customer Reviews

No reviews yet. Be the first to review Idahome Energy!

Write a Review

Frequently Asked Questions

How do I get a quote from Idahome Energy?

You can request a quote through the form on this page or contact Idahome Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Idahome Energy serve?

Idahome Energy is based in Boise and serves within a 150 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Idahome Energy hold?

This profile lists the following reported certifications: BBB Accredited, Licensed Idaho Contractor, APsystems Certified. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Idahome Energy offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Idahome Energy for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Idahome Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Idahome Energy handle permits and paperwork?

The exact scope is not verified on this profile. Ask Idahome Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2018
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Idahome Energy

Send your project details to request follow-up from Idahome Energy. Response timing and consultation terms are set by the company.

For Idahome Energy

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
I

Idahome Energy

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.