Home Team Energy in Milwaukee
7+ yrs
Experience
600+
Projects
100 km
Service radius
11-50
Employees
Profile information
About Home Team Energy
Local Wisconsin solar installer with 600+ residential installations and all in-house crews
Milwaukee, Wisconsin 53005
Milwaukee, Wisconsin 53005
Services Offered
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Inverters
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Home Team Energy!
Frequently Asked Questions
How do I get a quote from Home Team Energy?
You can request a quote through the form on this page or contact Home Team Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Home Team Energy serve?
Home Team Energy is based in Milwaukee and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Home Team Energy hold?
This profile does not list independently verified certifications. Ask Home Team Energy for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does Home Team Energy offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Home Team Energy for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Home Team Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Home Team Energy handle permits and paperwork?
The exact scope is not verified on this profile. Ask Home Team Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Home Team Energy
Send your project details to request follow-up from Home Team Energy. Response timing and consultation terms are set by the company.
For Home Team Energy
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Home Team Energy