H

Home Solar CT in Hartford

Hartford, Connecticut·Solar Installation
Residential

8+ yrs

Experience

400+

Projects

100 km

Service radius

11-50

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Home Solar CT

NABCEP-certified Connecticut solar provider offering 24/7 availability and flexible financing options

Hartford, Connecticut 06795

Hartford, Connecticut 06795

Services Offered

Solar InstallationBattery StorageSolar DesignEnergy AuditGrid Connection

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Qcells

Inverters

Enphase

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Hartford, ConnecticutWest Hartford, ConnecticutWatertown, ConnecticutWaterbury, ConnecticutNew Britain, ConnecticutTorrington, ConnecticutBristol, ConnecticutLitchfield, Connecticut

Customer Reviews

No reviews yet. Be the first to review Home Solar CT!

Write a Review

Frequently Asked Questions

How do I get a quote from Home Solar CT?

You can request a quote through the form on this page or contact Home Solar CT directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Home Solar CT serve?

Home Solar CT is based in Hartford and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Home Solar CT hold?

This profile lists the following reported certifications: NABCEP. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Home Solar CT offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Home Solar CT for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Home Solar CT for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Home Solar CT handle permits and paperwork?

The exact scope is not verified on this profile. Ask Home Solar CT which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2018
Employees11-50
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Home Solar CT

Send your project details to request follow-up from Home Solar CT. Response timing and consultation terms are set by the company.

For Home Solar CT

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
H

Home Solar CT

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.