H

Haleakala Solar & Roofing in Honolulu

Honolulu, Hawaii·Solar Installation
ResidentialCommercial

49+ yrs

Experience

80 km

Service radius

51-200

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Haleakala Solar & Roofing

Published directory profile for Haleakala Solar & Roofing in Honolulu. Verify services, credentials, ratings, and references directly with their original sources.

Honolulu, Hawaii 96701

Honolulu, Hawaii 96701

Services Offered

Solar InstallationBattery StorageSolar DesignRoof AssessmentMaintenanceGrid Connection

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB A+ RatedBBB Accredited

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

RECPanasonic

Inverters

EnphaseSolarEdge

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Honolulu, HawaiiAiea, HawaiiPearl City, HawaiiKailua, HawaiiKaneohe, HawaiiKapolei, HawaiiEwa Beach, Hawaii

Customer Reviews

No reviews yet. Be the first to review Haleakala Solar & Roofing!

Write a Review

Frequently Asked Questions

How do I get a quote from Haleakala Solar & Roofing?

You can request a quote through the form on this page or contact Haleakala Solar & Roofing directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Haleakala Solar & Roofing serve?

Haleakala Solar & Roofing is based in Honolulu and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Haleakala Solar & Roofing hold?

This profile lists the following reported certifications: BBB A+ Rated, BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Haleakala Solar & Roofing offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Haleakala Solar & Roofing for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Haleakala Solar & Roofing for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Haleakala Solar & Roofing handle permits and paperwork?

The exact scope is not verified on this profile. Ask Haleakala Solar & Roofing which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded1977
Employees51-200
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Haleakala Solar & Roofing

Send your project details to request follow-up from Haleakala Solar & Roofing. Response timing and consultation terms are set by the company.

For Haleakala Solar & Roofing

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
H

Haleakala Solar & Roofing

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.