G

GroundUp Solar & Electrical in Baton Rouge

Baton Rouge, Louisiana·Solar Installation
ResidentialCommercial
0

60 km

Service radius

1-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About GroundUp Solar & Electrical

Full-service Baton Rouge solar and electrical contractor offering custom installations, repairs, and maintenance

Baton Rouge, Louisiana 70816

Baton Rouge, Louisiana 70816

Services Offered

Solar InstallationMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

Louisiana Licensed Contractor (334635)BBB Accredited

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Baton Rouge, LouisianaPrairieville, LouisianaGonzales, LouisianaDenham Springs, LouisianaCentral, Louisiana

Customer Reviews

No reviews yet. Be the first to review GroundUp Solar & Electrical!

Write a Review

Frequently Asked Questions

How do I get a quote from GroundUp Solar & Electrical?

You can request a quote through the form on this page or contact GroundUp Solar & Electrical directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does GroundUp Solar & Electrical serve?

GroundUp Solar & Electrical is based in Baton Rouge and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does GroundUp Solar & Electrical hold?

This profile lists the following reported certifications: Louisiana Licensed Contractor (334635), BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does GroundUp Solar & Electrical offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask GroundUp Solar & Electrical for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask GroundUp Solar & Electrical for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does GroundUp Solar & Electrical handle permits and paperwork?

The exact scope is not verified on this profile. Ask GroundUp Solar & Electrical which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

0
Employees1-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from GroundUp Solar & Electrical

Send your project details to request follow-up from GroundUp Solar & Electrical. Response timing and consultation terms are set by the company.

For GroundUp Solar & Electrical

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
G

GroundUp Solar & Electrical

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.