Green Wave Solar in Huntsville
200 km
Service radius
11-50
Employees
Profile information
About Green Wave Solar
NABCEP-certified and award-winning solar installer serving the TVA region with residential and commercial solutions
Huntsville, Alabama 37130
Huntsville, Alabama 37130
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Green Wave Solar!
Frequently Asked Questions
How do I get a quote from Green Wave Solar?
You can request a quote through the form on this page or contact Green Wave Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Green Wave Solar serve?
Green Wave Solar is based in Huntsville and serves within a 200 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Green Wave Solar hold?
This profile lists the following reported certifications: NABCEP Certified, 2023 RE+ Installer of the Year. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Green Wave Solar offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Green Wave Solar for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Green Wave Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Green Wave Solar handle permits and paperwork?
The exact scope is not verified on this profile. Ask Green Wave Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Green Wave Solar
Send your project details to request follow-up from Green Wave Solar. Response timing and consultation terms are set by the company.
For Green Wave Solar
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Green Wave Solar