Green Street Solar in Baltimore
11+ yrs
Experience
120 km
Service radius
2-10
Employees
Profile information
About Green Street Solar
Local solar installer specializing in residential and small commercial grid-tied PV systems across Maryland and Delaware
Baltimore, Maryland 21212
Baltimore, Maryland 21212
Services Offered
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Green Street Solar!
Frequently Asked Questions
How do I get a quote from Green Street Solar?
You can request a quote through the form on this page or contact Green Street Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Green Street Solar serve?
Green Street Solar is based in Baltimore and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Green Street Solar hold?
This profile does not list independently verified certifications. Ask Green Street Solar for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does Green Street Solar offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Green Street Solar for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Green Street Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Green Street Solar handle permits and paperwork?
The exact scope is not verified on this profile. Ask Green Street Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Green Street Solar
Send your project details to request follow-up from Green Street Solar. Response timing and consultation terms are set by the company.
For Green Street Solar
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Green Street Solar