G

Green Ridge Solar in Portland

Portland, Oregon·Solar Installation
Residential

10+ yrs

Experience

100 km

Service radius

11-50

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Green Ridge Solar

Published directory profile for Green Ridge Solar in Portland. Verify services, credentials, ratings, and references directly with their original sources.

Portland, Oregon 97140

Portland, Oregon 97140

Services Offered

Solar InstallationBattery Storagesystem_design

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB Accredited

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Portland, OregonSherwood, OregonTigard, OregonTualatin, OregonBeaverton, OregonSalem, Oregon

Customer Reviews

No reviews yet. Be the first to review Green Ridge Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Green Ridge Solar?

You can request a quote through the form on this page or contact Green Ridge Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Green Ridge Solar serve?

Green Ridge Solar is based in Portland and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Green Ridge Solar hold?

This profile lists the following reported certifications: BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Green Ridge Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Green Ridge Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Green Ridge Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Green Ridge Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Green Ridge Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2016
Employees11-50
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Green Ridge Solar

Send your project details to request follow-up from Green Ridge Solar. Response timing and consultation terms are set by the company.

For Green Ridge Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
G

Green Ridge Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.