G

Green Power Energy in Newark

Newark, New Jersey·Solar Installation
ResidentialCommercial

17+ yrs

Experience

120 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Green Power Energy

Full-service solar installer with 15+ years of experience serving New Jersey, Connecticut, and Pennsylvania homeowners

Newark, New Jersey 07102

Newark, New Jersey 07102

Services Offered

Solar InstallationBattery StorageEV ChargingSolar DesignRoof Assessment

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

RECSilfab

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase IQ Battery

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Newark, New JerseyAnnandale, New JerseyMorristown, New JerseyPrinceton, New JerseyTrenton, New JerseyNew Brunswick, New JerseyFlemington, New Jersey

Customer Reviews

No reviews yet. Be the first to review Green Power Energy!

Write a Review

Frequently Asked Questions

How do I get a quote from Green Power Energy?

You can request a quote through the form on this page or contact Green Power Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Green Power Energy serve?

Green Power Energy is based in Newark and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Green Power Energy hold?

This profile lists the following reported certifications: NABCEP. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Green Power Energy offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Green Power Energy for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Green Power Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Green Power Energy handle permits and paperwork?

The exact scope is not verified on this profile. Ask Green Power Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2009
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Green Power Energy

Send your project details to request follow-up from Green Power Energy. Response timing and consultation terms are set by the company.

For Green Power Energy

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
G

Green Power Energy

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.