G

Green Energy Services in Bakersfield

Bakersfield, California·Solar Installation
ResidentialCommercial

15+ yrs

Experience

120 km

Service radius

2-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Green Energy Services

Locally owned Bakersfield solar and EV charger installer serving Kern County and beyond since 2011

Bakersfield, California 93313

Bakersfield, California 93313

Services Offered

Solar InstallationBattery StorageEV ChargingMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

CSLB #1095087

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Bakersfield, CaliforniaDelano, CaliforniaRidgecrest, CaliforniaShafter, CaliforniaWasco, CaliforniaTehachapi, California

Customer Reviews

No reviews yet. Be the first to review Green Energy Services!

Write a Review

Frequently Asked Questions

How do I get a quote from Green Energy Services?

You can request a quote through the form on this page or contact Green Energy Services directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Green Energy Services serve?

Green Energy Services is based in Bakersfield and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Green Energy Services hold?

This profile lists the following reported certifications: CSLB #1095087. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Green Energy Services offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Green Energy Services for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Green Energy Services for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Green Energy Services handle permits and paperwork?

The exact scope is not verified on this profile. Ask Green Energy Services which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2011
Employees2-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Green Energy Services

Send your project details to request follow-up from Green Energy Services. Response timing and consultation terms are set by the company.

For Green Energy Services

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
G

Green Energy Services

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.