Good Energy Solutions in Wichita
19+ yrs
Experience
200 km
Service radius
11-50
Employees
Profile information
About Good Energy Solutions
Kansas and Missouri's most NABCEP-certified solar company and Tesla Powerwall Certified Installer
Wichita, Kansas 66046
Wichita, Kansas 66046
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Panels
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Good Energy Solutions!
Frequently Asked Questions
How do I get a quote from Good Energy Solutions?
You can request a quote through the form on this page or contact Good Energy Solutions directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Good Energy Solutions serve?
Good Energy Solutions is based in Wichita and serves within a 200 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Good Energy Solutions hold?
This profile lists the following reported certifications: NABCEP Certified (most in KS/MO), Tesla Powerwall Certified Installer, SunPower Elite Dealer, BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Good Energy Solutions offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Good Energy Solutions for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Good Energy Solutions for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Good Energy Solutions handle permits and paperwork?
The exact scope is not verified on this profile. Ask Good Energy Solutions which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Good Energy Solutions
Send your project details to request follow-up from Good Energy Solutions. Response timing and consultation terms are set by the company.
For Good Energy Solutions
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Good Energy Solutions