G

Gold Path Solar in Lexington

Lexington, Kentucky·Solar Installation
Residential

4+ yrs

Experience

150 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Gold Path Solar

EnergySage Installer of the Year serving Lexington with personalized residential solar solutions and employee-owned service

Lexington, Kentucky 43017

Lexington, Kentucky 43017

Services Offered

Solar InstallationBattery StorageMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

EnergySage Installer of the Year 2025EnergySage Installer of the Year 2026BBB Accredited

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Lexington, KentuckyLouisville, KentuckyGeorgetown, KentuckyNicholasville, KentuckyRichmond, KentuckyFrankfort, Kentucky

Customer Reviews

No reviews yet. Be the first to review Gold Path Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Gold Path Solar?

You can request a quote through the form on this page or contact Gold Path Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Gold Path Solar serve?

Gold Path Solar is based in Lexington and serves within a 150 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Gold Path Solar hold?

This profile lists the following reported certifications: EnergySage Installer of the Year 2025, EnergySage Installer of the Year 2026, BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Gold Path Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Gold Path Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Gold Path Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Gold Path Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Gold Path Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2022
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Gold Path Solar

Send your project details to request follow-up from Gold Path Solar. Response timing and consultation terms are set by the company.

For Gold Path Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
G

Gold Path Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.