G

GenPro Energy Solutions in Omaha

Omaha, Nebraska·Solar Installation
ResidentialCommercial

19+ yrs

Experience

300 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About GenPro Energy Solutions

Tesla and Generac certified solar installer serving Nebraska since 2007

Omaha, Nebraska 57769

Omaha, Nebraska 57769

Services Offered

Solar InstallationBattery Storage

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

Tesla Certified InstallerGenerac Certified Installer

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Batteries

Tesla PowerwallGenerac PWRcell

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Omaha, NebraskaLincoln, NebraskaCentral City, NebraskaGrand Island, NebraskaKearney, Nebraska

Customer Reviews

No reviews yet. Be the first to review GenPro Energy Solutions!

Write a Review

Frequently Asked Questions

How do I get a quote from GenPro Energy Solutions?

You can request a quote through the form on this page or contact GenPro Energy Solutions directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does GenPro Energy Solutions serve?

GenPro Energy Solutions is based in Omaha and serves within a 300 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does GenPro Energy Solutions hold?

This profile lists the following reported certifications: Tesla Certified Installer, Generac Certified Installer. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does GenPro Energy Solutions offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask GenPro Energy Solutions for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask GenPro Energy Solutions for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does GenPro Energy Solutions handle permits and paperwork?

The exact scope is not verified on this profile. Ask GenPro Energy Solutions which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2007
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from GenPro Energy Solutions

Send your project details to request follow-up from GenPro Energy Solutions. Response timing and consultation terms are set by the company.

For GenPro Energy Solutions

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
G

GenPro Energy Solutions

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.