Gault Electric in Norfolk
38+ yrs
Experience
80 km
Service radius
11-50
Employees
Profile information
About Gault Electric
Hampton Roads electrical and solar contractor since 1988 with comprehensive solar, HVAC, and generator services
Norfolk, Virginia 23606
Norfolk, Virginia 23606
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Gault Electric!
Frequently Asked Questions
How do I get a quote from Gault Electric?
You can request a quote through the form on this page or contact Gault Electric directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Gault Electric serve?
Gault Electric is based in Norfolk and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Gault Electric hold?
This profile lists the following reported certifications: BBB Accredited, NABCEP Certified. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Gault Electric offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Gault Electric for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Gault Electric for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Gault Electric handle permits and paperwork?
The exact scope is not verified on this profile. Ask Gault Electric which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Gault Electric
Send your project details to request follow-up from Gault Electric. Response timing and consultation terms are set by the company.
For Gault Electric
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Gault Electric