G

Galaxy Solar Co in Mesa

Mesa, Arizona·Solar Installation
ResidentialCommercial

7+ yrs

Experience

60 km

Service radius

1-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Galaxy Solar Co

NABCEP certified Mesa solar installer serving residential and commercial clients across Arizona, California, and Texas

Mesa, Arizona 85205

Mesa, Arizona 85205

Services Offered

Solar InstallationMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP Certified

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Mesa, ArizonaPhoenix, ArizonaScottsdale, ArizonaTempe, ArizonaGilbert, ArizonaChandler, Arizona

Customer Reviews

No reviews yet. Be the first to review Galaxy Solar Co!

Write a Review

Frequently Asked Questions

How do I get a quote from Galaxy Solar Co?

You can request a quote through the form on this page or contact Galaxy Solar Co directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Galaxy Solar Co serve?

Galaxy Solar Co is based in Mesa and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Galaxy Solar Co hold?

This profile lists the following reported certifications: NABCEP Certified. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Galaxy Solar Co offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Galaxy Solar Co for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Galaxy Solar Co for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Galaxy Solar Co handle permits and paperwork?

The exact scope is not verified on this profile. Ask Galaxy Solar Co which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2019
Employees1-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Galaxy Solar Co

Send your project details to request follow-up from Galaxy Solar Co. Response timing and consultation terms are set by the company.

For Galaxy Solar Co

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
G

Galaxy Solar Co

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.