F

Fresh Coast Solar in Chicago

Chicago, Illinois·Solar Installation
ResidentialCommercial

8+ yrs

Experience

100 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Fresh Coast Solar

Full-service EPC solar firm designing and installing systems across the Midwest since 2018

Chicago, Illinois 60614

Chicago, Illinois 60614

Services Offered

Solar InstallationBattery Storage

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Chicago, IllinoisEvanston, IllinoisNaperville, IllinoisAurora, IllinoisJoliet, Illinois

Customer Reviews

No reviews yet. Be the first to review Fresh Coast Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Fresh Coast Solar?

You can request a quote through the form on this page or contact Fresh Coast Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Fresh Coast Solar serve?

Fresh Coast Solar is based in Chicago and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Fresh Coast Solar hold?

This profile does not list independently verified certifications. Ask Fresh Coast Solar for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Fresh Coast Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Fresh Coast Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Fresh Coast Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Fresh Coast Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Fresh Coast Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2018
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Fresh Coast Solar

Send your project details to request follow-up from Fresh Coast Solar. Response timing and consultation terms are set by the company.

For Fresh Coast Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
F

Fresh Coast Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.