F

Feazel in Cleveland

Cleveland, Ohio·Solar Installation
ResidentialCommercial

38+ yrs

Experience

120 km

Service radius

51-200

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Feazel

Award-winning roofing and solar company since 1988 — GAF Timberline Solar Shingles and rack-mount panels

Cleveland, Ohio 44130

Cleveland, Ohio 44130

Services Offered

Solar InstallationMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP CertifiedBBB A+GAF Master Elite CertifiedGAF Certified Green RooferEPA Lead-Safe ContractorREC Certified

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

GAF Timberline Solar

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

25yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Cleveland, OhioParma, OhioAkron, OhioLakewood, OhioStrongsville, Ohio

Customer Reviews

No reviews yet. Be the first to review Feazel!

Write a Review

Frequently Asked Questions

How do I get a quote from Feazel?

You can request a quote through the form on this page or contact Feazel directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Feazel serve?

Feazel is based in Cleveland and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Feazel hold?

This profile lists the following reported certifications: NABCEP Certified, BBB A+, GAF Master Elite Certified, GAF Certified Green Roofer, EPA Lead-Safe Contractor, REC Certified. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Feazel offer?

This profile reports 25-year panel coverage and 25-year workmanship coverage. Ask Feazel for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Feazel for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Feazel handle permits and paperwork?

The exact scope is not verified on this profile. Ask Feazel which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded1988
Employees51-200
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Feazel

Send your project details to request follow-up from Feazel. Response timing and consultation terms are set by the company.

For Feazel

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.