E

Evolution Energy in Los Angeles

Los Angeles, California·Solar Installation
ResidentialCommercial

17+ yrs

Experience

1500+

Projects

80 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Evolution Energy

Published directory profile for Evolution Energy in Los Angeles. Verify services, credentials, ratings, and references directly with their original sources.

Los Angeles, California 90241

Los Angeles, California 90241

Services Offered

Solar InstallationBattery StorageSolar DesignEnergy AuditMonitoringGrid Connection

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Mission Solar

Inverters

EnphaseFronius

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

25yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Los Angeles, CaliforniaDowney, CaliforniaWhittier, CaliforniaNorwalk, CaliforniaCerritos, CaliforniaLong Beach, CaliforniaLakewood, CaliforniaCompton, CaliforniaBellflower, CaliforniaPico Rivera, California

Customer Reviews

No reviews yet. Be the first to review Evolution Energy!

Write a Review

Frequently Asked Questions

How do I get a quote from Evolution Energy?

You can request a quote through the form on this page or contact Evolution Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Evolution Energy serve?

Evolution Energy is based in Los Angeles and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Evolution Energy hold?

This profile does not list independently verified certifications. Ask Evolution Energy for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Evolution Energy offer?

This profile reports 25-year panel coverage and 25-year workmanship coverage. Ask Evolution Energy for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Evolution Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Evolution Energy handle permits and paperwork?

The exact scope is not verified on this profile. Ask Evolution Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2009
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Evolution Energy

Send your project details to request follow-up from Evolution Energy. Response timing and consultation terms are set by the company.

For Evolution Energy

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
E

Evolution Energy

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.