E

Ethical Energy Solar in Pittsburgh

Pittsburgh, Pennsylvania·Solar Installation
Residential

6+ yrs

Experience

150 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Ethical Energy Solar

Pennsylvania solar installer helping thousands of homeowners go solar with personalized service and US-made components

Pittsburgh, Pennsylvania 15239

Pittsburgh, Pennsylvania 15239

Services Offered

Solar InstallationBattery StorageSolar DesignEnergy AuditGrid ConnectionMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

US-Made Solar Panels

Inverters

Enphase

Batteries

Enphase IQ Battery

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Pittsburgh, PennsylvaniaPlum, PennsylvaniaMonroeville, PennsylvaniaMurrysville, PennsylvaniaIrwin, PennsylvaniaGreensburg, PennsylvaniaYork, Pennsylvania

Customer Reviews

No reviews yet. Be the first to review Ethical Energy Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Ethical Energy Solar?

You can request a quote through the form on this page or contact Ethical Energy Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Ethical Energy Solar serve?

Ethical Energy Solar is based in Pittsburgh and serves within a 150 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Ethical Energy Solar hold?

This profile lists the following reported certifications: NABCEP. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Ethical Energy Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Ethical Energy Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Ethical Energy Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Ethical Energy Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Ethical Energy Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2020
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Ethical Energy Solar

Send your project details to request follow-up from Ethical Energy Solar. Response timing and consultation terms are set by the company.

For Ethical Energy Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
E

Ethical Energy Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.