Energy Solutions in Des Moines
100 km
Service radius
2-10
Employees
Profile information
About Energy Solutions
Certified solar professionals with over 40 years of combined electrical experience serving residential, commercial, and industrial customers in Des Moines
Des Moines, Iowa 50315
Des Moines, Iowa 50315
Services Offered
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
5yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Energy Solutions!
Frequently Asked Questions
How do I get a quote from Energy Solutions?
You can request a quote through the form on this page or contact Energy Solutions directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Energy Solutions serve?
Energy Solutions is based in Des Moines and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Energy Solutions hold?
This profile does not list independently verified certifications. Ask Energy Solutions for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does Energy Solutions offer?
This profile reports 25-year panel coverage and 5-year workmanship coverage. Ask Energy Solutions for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Energy Solutions for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Energy Solutions handle permits and paperwork?
The exact scope is not verified on this profile. Ask Energy Solutions which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Energy Solutions
Send your project details to request follow-up from Energy Solutions. Response timing and consultation terms are set by the company.
For Energy Solutions
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Energy Solutions