E

Energy Doctors in Salt Lake City

Salt Lake City, Utah·Solar Installation
Residential

16+ yrs

Experience

80 km

Service radius

2-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Energy Doctors

Home energy efficiency experts offering solar, insulation, and radiant barrier solutions in Salt Lake City since 2010

Salt Lake City, Utah 84123

Salt Lake City, Utah 84123

Services Offered

Solar InstallationEnergy AuditMaintenance

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Salt Lake City, UtahMurray, UtahSandy, UtahWest Valley City, UtahTaylorsville, UtahMillcreek, Utah

Customer Reviews

No reviews yet. Be the first to review Energy Doctors!

Write a Review

Frequently Asked Questions

How do I get a quote from Energy Doctors?

You can request a quote through the form on this page or contact Energy Doctors directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Energy Doctors serve?

Energy Doctors is based in Salt Lake City and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Energy Doctors hold?

This profile does not list independently verified certifications. Ask Energy Doctors for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Energy Doctors offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Energy Doctors for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Energy Doctors for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Energy Doctors handle permits and paperwork?

The exact scope is not verified on this profile. Ask Energy Doctors which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2010
Employees2-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Energy Doctors

Send your project details to request follow-up from Energy Doctors. Response timing and consultation terms are set by the company.

For Energy Doctors

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
E

Energy Doctors

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.