E

Energy Design in Eugene

Eugene, Oregon·Solar Installation
ResidentialCommercial

22+ yrs

Experience

1000+

Projects

150 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Energy Design

Eugene's locally owned solar contractor with over 1,000 installations and 20 years of experience since 2004

Eugene, Oregon 97402

Eugene, Oregon 97402

Services Offered

Solar InstallationBattery StorageEV ChargingSolar DesignMaintenanceMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

Energy Trust of Oregon Trade AllyOregon Contractor License

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SunPowerRECSilfabMission Solar

Inverters

SMASolarEdgeSol-ArkEnphaseFronius

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

30yr

Panel Warranty

25yr

Inverter Warranty

7yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Eugene, OregonSpringfield, OregonCorvallis, OregonAlbany, OregonCottage Grove, Oregon

Customer Reviews

No reviews yet. Be the first to review Energy Design!

Write a Review

Frequently Asked Questions

How do I get a quote from Energy Design?

You can request a quote through the form on this page or contact Energy Design directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Energy Design serve?

Energy Design is based in Eugene and serves within a 150 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Energy Design hold?

This profile lists the following reported certifications: Energy Trust of Oregon Trade Ally, Oregon Contractor License. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Energy Design offer?

This profile reports 30-year panel coverage and 7-year workmanship coverage. Ask Energy Design for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Energy Design for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Energy Design handle permits and paperwork?

The exact scope is not verified on this profile. Ask Energy Design which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2004
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Energy Design

Send your project details to request follow-up from Energy Design. Response timing and consultation terms are set by the company.

For Energy Design

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
E

Energy Design

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.