E

Emerald Sun Energy in Orlando

Orlando, Florida·Solar Installation
ResidentialCommercial

11+ yrs

Experience

80 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Emerald Sun Energy

Orlando-based solar contractor serving residential and commercial clients since 2015

Orlando, Florida 32837

Orlando, Florida 32837

Services Offered

Solar InstallationBattery Storageconsulting

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Orlando, FloridaKissimmee, FloridaWinter Park, FloridaDaytona Beach, FloridaMelbourne, Florida

Customer Reviews

No reviews yet. Be the first to review Emerald Sun Energy!

Write a Review

Frequently Asked Questions

How do I get a quote from Emerald Sun Energy?

You can request a quote through the form on this page or contact Emerald Sun Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Emerald Sun Energy serve?

Emerald Sun Energy is based in Orlando and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Emerald Sun Energy hold?

This profile does not list independently verified certifications. Ask Emerald Sun Energy for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Emerald Sun Energy offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Emerald Sun Energy for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Emerald Sun Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Emerald Sun Energy handle permits and paperwork?

The exact scope is not verified on this profile. Ask Emerald Sun Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2015
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Emerald Sun Energy

Send your project details to request follow-up from Emerald Sun Energy. Response timing and consultation terms are set by the company.

For Emerald Sun Energy

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
E

Emerald Sun Energy

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.