E

Emerald Energy in Charlotte

Charlotte, North Carolina·Solar Installation
ResidentialCommercial

17+ yrs

Experience

200 km

Service radius

2-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Emerald Energy

Raleigh-based solar contractor serving Charlotte and 77% of North Carolina with a 25-year workmanship warranty since 2009

Charlotte, North Carolina 27615

Charlotte, North Carolina 27615

Services Offered

Solar InstallationBattery StorageSolar DesignEnergy Auditoff_grid_solarCommercial Solar

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP CertifiedBPI Accredited ContractorTesla Powerwall CertifiedEnphase CertifiedGenerac Powercell CertifiedFortress Battery Certified Gold InstallerSol-Ark Certified

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Canadian SolarQ Cells

Inverters

EnphaseSolarEdgeSol-Ark

Batteries

Tesla PowerwallEnphaseFortress PowerGenerac

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

25yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Charlotte, North CarolinaRaleigh, North CarolinaGreensboro, North CarolinaDurham, North CarolinaWinston-Salem, North CarolinaCary, North CarolinaFayetteville, North CarolinaWilmington, North Carolina

Customer Reviews

No reviews yet. Be the first to review Emerald Energy!

Write a Review

Frequently Asked Questions

How do I get a quote from Emerald Energy?

You can request a quote through the form on this page or contact Emerald Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Emerald Energy serve?

Emerald Energy is based in Charlotte and serves within a 200 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Emerald Energy hold?

This profile lists the following reported certifications: NABCEP Certified, BPI Accredited Contractor, Tesla Powerwall Certified, Enphase Certified, Generac Powercell Certified, Fortress Battery Certified Gold Installer, Sol-Ark Certified. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Emerald Energy offer?

This profile reports 25-year panel coverage and 25-year workmanship coverage. Ask Emerald Energy for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Emerald Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Emerald Energy handle permits and paperwork?

The exact scope is not verified on this profile. Ask Emerald Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2009
Employees2-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Emerald Energy

Send your project details to request follow-up from Emerald Energy. Response timing and consultation terms are set by the company.

For Emerald Energy

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
E

Emerald Energy

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.