E

Elemental Energy in Portland

Portland, Oregon·Solar Installation
ResidentialCommercial

16+ yrs

Experience

100 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Elemental Energy

Engineer-founded solar installer recognized as Pacific Northwest's top residential and storage contractor

Portland, Oregon 97218

Portland, Oregon 97218

Services Offered

Solar InstallationBattery Storagesystem_design

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB AccreditedEnergy Trust of Oregon Trade Ally

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Portland, OregonBeaverton, OregonLake Oswego, OregonTigard, OregonVancouver, Oregon

Customer Reviews

No reviews yet. Be the first to review Elemental Energy!

Write a Review

Frequently Asked Questions

How do I get a quote from Elemental Energy?

You can request a quote through the form on this page or contact Elemental Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Elemental Energy serve?

Elemental Energy is based in Portland and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Elemental Energy hold?

This profile lists the following reported certifications: BBB Accredited, Energy Trust of Oregon Trade Ally. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Elemental Energy offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Elemental Energy for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Elemental Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Elemental Energy handle permits and paperwork?

The exact scope is not verified on this profile. Ask Elemental Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2010
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Elemental Energy

Send your project details to request follow-up from Elemental Energy. Response timing and consultation terms are set by the company.

For Elemental Energy

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
E

Elemental Energy

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.