E

Energy Independent Solutions in Pittsburgh

Pittsburgh, Pennsylvania·Solar Installation
ResidentialCommercial

18+ yrs

Experience

120 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Energy Independent Solutions

Pittsburgh's most experienced solar installer with NABCEP-certified technicians serving Western Pennsylvania since 2008

Pittsburgh, Pennsylvania 15205

Pittsburgh, Pennsylvania 15205

Services Offered

Solar InstallationBattery StorageMaintenanceMonitoringSolar DesignEnergy AuditGrid Connection

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPBBB Accredited

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Monocrystalline Tier-1

Inverters

Enphase

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Pittsburgh, PennsylvaniaCrafton, PennsylvaniaCranberry Township, PennsylvaniaGreensburg, PennsylvaniaWashington, PennsylvaniaMurrysville, PennsylvaniaWexford, Pennsylvania

Customer Reviews

No reviews yet. Be the first to review Energy Independent Solutions!

Write a Review

Frequently Asked Questions

How do I get a quote from Energy Independent Solutions?

You can request a quote through the form on this page or contact Energy Independent Solutions directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Energy Independent Solutions serve?

Energy Independent Solutions is based in Pittsburgh and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Energy Independent Solutions hold?

This profile lists the following reported certifications: NABCEP, BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Energy Independent Solutions offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Energy Independent Solutions for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Energy Independent Solutions for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Energy Independent Solutions handle permits and paperwork?

The exact scope is not verified on this profile. Ask Energy Independent Solutions which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2008
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Energy Independent Solutions

Send your project details to request follow-up from Energy Independent Solutions. Response timing and consultation terms are set by the company.

For Energy Independent Solutions

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
E

Energy Independent Solutions

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.