E

Ecovis Solar in Buffalo

Buffalo, New York·Solar Installation
ResidentialCommercial

23+ yrs

Experience

120 km

Service radius

1-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Ecovis Solar

NABCEP-certified and NYSERDA-approved solar installer serving Buffalo, Rochester, and Syracuse since 2003

Buffalo, New York 14420

Buffalo, New York 14420

Services Offered

Solar InstallationSolar DesignMaintenanceGrid Connection

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP Certified InstallerNYSERDA ApprovedBBB Accredited

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Buffalo, New YorkRochester, New YorkSyracuse, New YorkBrockport, New YorkBatavia, New YorkCanandaigua, New York

Customer Reviews

No reviews yet. Be the first to review Ecovis Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Ecovis Solar?

You can request a quote through the form on this page or contact Ecovis Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Ecovis Solar serve?

Ecovis Solar is based in Buffalo and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Ecovis Solar hold?

This profile lists the following reported certifications: NABCEP Certified Installer, NYSERDA Approved, BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Ecovis Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Ecovis Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Ecovis Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Ecovis Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Ecovis Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2003
Employees1-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Ecovis Solar

Send your project details to request follow-up from Ecovis Solar. Response timing and consultation terms are set by the company.

For Ecovis Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
E

Ecovis Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.