E

EcoHouse Solar in Columbus

Columbus, Ohio·Solar Installation
ResidentialCommercial

18+ yrs

Experience

100 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About EcoHouse Solar

Columbus's top local solar company with 300+ installations and NABCEP-certified technicians since 2008

Columbus, Ohio 43228

Columbus, Ohio 43228

Services Offered

Solar InstallationSolar DesignMonitoringMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

JinkoSolar

Inverters

EnphaseSolarEdge

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Columbus, OhioDublin, OhioWesterville, OhioHilliard, OhioGrove City, OhioReynoldsburg, OhioGahanna, OhioUpper Arlington, Ohio

Customer Reviews

No reviews yet. Be the first to review EcoHouse Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from EcoHouse Solar?

You can request a quote through the form on this page or contact EcoHouse Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does EcoHouse Solar serve?

EcoHouse Solar is based in Columbus and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does EcoHouse Solar hold?

This profile lists the following reported certifications: NABCEP. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does EcoHouse Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask EcoHouse Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask EcoHouse Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does EcoHouse Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask EcoHouse Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2008
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from EcoHouse Solar

Send your project details to request follow-up from EcoHouse Solar. Response timing and consultation terms are set by the company.

For EcoHouse Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
E

EcoHouse Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.