E

Eco Solar Hawaii in Honolulu

Honolulu, Hawaii·Solar Installation
Residential

18+ yrs

Experience

60 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Eco Solar Hawaii

Hawaii's only SunPower Master Dealer and Tesla Powerwall Premier Installer serving Oahu for over 16 years

Honolulu, Hawaii 96797

Honolulu, Hawaii 96797

Services Offered

Solar InstallationBattery StorageSolar DesignEnergy AuditGrid ConnectionMonitoringMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB A+ RatedSunPower Master DealerMaxeon Preferred PartnerTesla Powerwall Premier Installer

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SunPowerMaxeon

Inverters

EnphaseSolarEdge

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Honolulu, HawaiiWaipahu, HawaiiPearl City, HawaiiKapolei, HawaiiEwa Beach, HawaiiMililani, HawaiiKailua, Hawaii

Customer Reviews

No reviews yet. Be the first to review Eco Solar Hawaii!

Write a Review

Frequently Asked Questions

How do I get a quote from Eco Solar Hawaii?

You can request a quote through the form on this page or contact Eco Solar Hawaii directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Eco Solar Hawaii serve?

Eco Solar Hawaii is based in Honolulu and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Eco Solar Hawaii hold?

This profile lists the following reported certifications: BBB A+ Rated, SunPower Master Dealer, Maxeon Preferred Partner, Tesla Powerwall Premier Installer. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Eco Solar Hawaii offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Eco Solar Hawaii for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Eco Solar Hawaii for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Eco Solar Hawaii handle permits and paperwork?

The exact scope is not verified on this profile. Ask Eco Solar Hawaii which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2008
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Eco Solar Hawaii

Send your project details to request follow-up from Eco Solar Hawaii. Response timing and consultation terms are set by the company.

For Eco Solar Hawaii

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
E

Eco Solar Hawaii

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.