E

Eagle Point Solar in Des Moines

Des Moines, Iowa·Solar Installation
ResidentialCommercial

16+ yrs

Experience

200 km

Service radius

51-200

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Eagle Point Solar

Iowa's largest solar installer with over 100 NABCEP-certified employees serving residential, commercial, and agricultural customers since 2010

Des Moines, Iowa 50313

Des Moines, Iowa 50313

Services Offered

Solar InstallationSolar DesignBattery StorageMaintenanceMonitoringGrid Connection

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPSEIA

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Des Moines, IowaDubuque, IowaCedar Rapids, IowaIowa City, IowaAnkeny, IowaAmes, IowaWaterloo, Iowa

Customer Reviews

No reviews yet. Be the first to review Eagle Point Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Eagle Point Solar?

You can request a quote through the form on this page or contact Eagle Point Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Eagle Point Solar serve?

Eagle Point Solar is based in Des Moines and serves within a 200 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Eagle Point Solar hold?

This profile lists the following reported certifications: NABCEP, SEIA. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Eagle Point Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Eagle Point Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Eagle Point Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Eagle Point Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Eagle Point Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2010
Employees51-200
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Eagle Point Solar

Send your project details to request follow-up from Eagle Point Solar. Response timing and consultation terms are set by the company.

For Eagle Point Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
E

Eagle Point Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.