D

Dovetail Solar and Wind in Columbus

Columbus, Ohio·Solar Installation
ResidentialCommercial

31+ yrs

Experience

515+

Projects

200 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Dovetail Solar and Wind

One of Ohio's oldest and largest renewable energy firms with 500+ installations and 20+ MW installed since 1995

Columbus, Ohio 43209

Columbus, Ohio 43209

Services Offered

Solar InstallationBattery StorageSolar DesignMaintenanceMonitoringCommercial Solar

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB Accredited

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Columbus, OhioCleveland, OhioCincinnati, OhioAthens, OhioLogan, OhioDublin, OhioWesterville, Ohio

Customer Reviews

No reviews yet. Be the first to review Dovetail Solar and Wind!

Write a Review

Frequently Asked Questions

How do I get a quote from Dovetail Solar and Wind?

You can request a quote through the form on this page or contact Dovetail Solar and Wind directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Dovetail Solar and Wind serve?

Dovetail Solar and Wind is based in Columbus and serves within a 200 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Dovetail Solar and Wind hold?

This profile lists the following reported certifications: BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Dovetail Solar and Wind offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Dovetail Solar and Wind for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Dovetail Solar and Wind for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Dovetail Solar and Wind handle permits and paperwork?

The exact scope is not verified on this profile. Ask Dovetail Solar and Wind which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded1995
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Dovetail Solar and Wind

Send your project details to request follow-up from Dovetail Solar and Wind. Response timing and consultation terms are set by the company.

For Dovetail Solar and Wind

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
D

Dovetail Solar and Wind

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.