D

Daniels Plumbing, Heating and Air Conditioning in Santa Fe

Santa Fe, New Mexico·Solar Installation
ResidentialCommercial
0

80 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Daniels Plumbing, Heating and Air Conditioning

Full-service HVAC and solar installation contractor on Cerrillos Road in Santa Fe

Santa Fe, New Mexico 87501

Santa Fe, New Mexico 87501

Services Offered

Solar InstallationMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

Licensed Contractor (NM)

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Santa Fe, New MexicoAlbuquerque, New Mexico

Customer Reviews

No reviews yet. Be the first to review Daniels Plumbing, Heating and Air Conditioning!

Write a Review

Frequently Asked Questions

How do I get a quote from Daniels Plumbing, Heating and Air Conditioning?

You can request a quote through the form on this page or contact Daniels Plumbing, Heating and Air Conditioning directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Daniels Plumbing, Heating and Air Conditioning serve?

Daniels Plumbing, Heating and Air Conditioning is based in Santa Fe and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Daniels Plumbing, Heating and Air Conditioning hold?

This profile lists the following reported certifications: Licensed Contractor (NM). SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Daniels Plumbing, Heating and Air Conditioning offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Daniels Plumbing, Heating and Air Conditioning for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Daniels Plumbing, Heating and Air Conditioning for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Daniels Plumbing, Heating and Air Conditioning handle permits and paperwork?

The exact scope is not verified on this profile. Ask Daniels Plumbing, Heating and Air Conditioning which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

0
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Daniels Plumbing, Heating and Air Conditioning

Send your project details to request follow-up from Daniels Plumbing, Heating and Air Conditioning. Response timing and consultation terms are set by the company.

For Daniels Plumbing, Heating and Air Conditioning

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
D

Daniels Plumbing, Heating and Air Conditioning

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.