C

Custom Solar and Leisure in Tucson

Tucson, Arizona·Solar Installation
ResidentialCommercial

19+ yrs

Experience

80 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Custom Solar and Leisure

NABCEP-certified Tucson solar expert since 2007 with BBB A+ accreditation and Angie's List Super Service awards

Tucson, Arizona 85711

Tucson, Arizona 85711

Services Offered

Solar InstallationBattery StorageMaintenanceMonitoringsolar_hot_water

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPBBB A+ AccreditedROC Licensed

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Tucson, ArizonaOro Valley, ArizonaMarana, ArizonaSahuarita, ArizonaGreen Valley, ArizonaVail, Arizona

Customer Reviews

No reviews yet. Be the first to review Custom Solar and Leisure!

Write a Review

Frequently Asked Questions

How do I get a quote from Custom Solar and Leisure?

You can request a quote through the form on this page or contact Custom Solar and Leisure directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Custom Solar and Leisure serve?

Custom Solar and Leisure is based in Tucson and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Custom Solar and Leisure hold?

This profile lists the following reported certifications: NABCEP, BBB A+ Accredited, ROC Licensed. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Custom Solar and Leisure offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Custom Solar and Leisure for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Custom Solar and Leisure for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Custom Solar and Leisure handle permits and paperwork?

The exact scope is not verified on this profile. Ask Custom Solar and Leisure which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2007
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Custom Solar and Leisure

Send your project details to request follow-up from Custom Solar and Leisure. Response timing and consultation terms are set by the company.

For Custom Solar and Leisure

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
C

Custom Solar and Leisure

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.