C

CST Solar (Consolidated Solar Technologies) in Santa Fe

Santa Fe, New Mexico·Solar Installation
ResidentialCommercial

18+ yrs

Experience

80 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About CST Solar (Consolidated Solar Technologies)

SunPower Elite Dealer in Santa Fe specializing in high-efficiency residential solar since 2008

Santa Fe, New Mexico 87505

Santa Fe, New Mexico 87505

Services Offered

Solar InstallationMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

SunPower Elite Dealer

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SunPower

Inverters

SunPower

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

15yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Santa Fe, New MexicoAlbuquerque, New MexicoLos Alamos, New Mexico

Customer Reviews

No reviews yet. Be the first to review CST Solar (Consolidated Solar Technologies)!

Write a Review

Frequently Asked Questions

How do I get a quote from CST Solar (Consolidated Solar Technologies)?

You can request a quote through the form on this page or contact CST Solar (Consolidated Solar Technologies) directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does CST Solar (Consolidated Solar Technologies) serve?

CST Solar (Consolidated Solar Technologies) is based in Santa Fe and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does CST Solar (Consolidated Solar Technologies) hold?

This profile lists the following reported certifications: SunPower Elite Dealer. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does CST Solar (Consolidated Solar Technologies) offer?

This profile reports 25-year panel coverage and 15-year workmanship coverage. Ask CST Solar (Consolidated Solar Technologies) for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask CST Solar (Consolidated Solar Technologies) for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does CST Solar (Consolidated Solar Technologies) handle permits and paperwork?

The exact scope is not verified on this profile. Ask CST Solar (Consolidated Solar Technologies) which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2008
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from CST Solar (Consolidated Solar Technologies)

Send your project details to request follow-up from CST Solar (Consolidated Solar Technologies). Response timing and consultation terms are set by the company.

For CST Solar (Consolidated Solar Technologies)

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
C

CST Solar (Consolidated Solar Technologies)

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.