C

Cool Roofs Memphis in Memphis

Memphis, Tennessee·Solar Installation
ResidentialCommercial

11+ yrs

Experience

80 km

Service radius

1-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Cool Roofs Memphis

Published directory profile for Cool Roofs Memphis in Memphis. Verify services, credentials, ratings, and references directly with their original sources.

Memphis, Tennessee 38104

Memphis, Tennessee 38104

Services Offered

Solar InstallationMaintenance

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Tesla

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Memphis, TennesseeGermantown, TennesseeBartlett, TennesseeCollierville, TennesseeMidtown, Tennessee

Customer Reviews

No reviews yet. Be the first to review Cool Roofs Memphis!

Write a Review

Frequently Asked Questions

How do I get a quote from Cool Roofs Memphis?

You can request a quote through the form on this page or contact Cool Roofs Memphis directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Cool Roofs Memphis serve?

Cool Roofs Memphis is based in Memphis and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Cool Roofs Memphis hold?

This profile does not list independently verified certifications. Ask Cool Roofs Memphis for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Cool Roofs Memphis offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Cool Roofs Memphis for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Cool Roofs Memphis for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Cool Roofs Memphis handle permits and paperwork?

The exact scope is not verified on this profile. Ask Cool Roofs Memphis which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2015
Employees1-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Cool Roofs Memphis

Send your project details to request follow-up from Cool Roofs Memphis. Response timing and consultation terms are set by the company.

For Cool Roofs Memphis

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
C

Cool Roofs Memphis

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.