C

Convert Solar in Richmond

Richmond, Virginia·Solar Installation
ResidentialCommercial

16+ yrs

Experience

150 km

Service radius

11-50

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Convert Solar

NABCEP-certified Class A solar contractor serving Richmond with turnkey residential and commercial solar energy solutions

Richmond, Virginia 23230

Richmond, Virginia 23230

Services Offered

Solar InstallationSolar DesignBattery StorageMaintenanceGrid Connectionfinancing_assistance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPClass A Contractor (VA)

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

RECQcells

Inverters

SolarEdgeEnphase

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Richmond, VirginiaVirginia Beach, VirginiaNorfolk, VirginiaHampton Roads, VirginiaLynchburg, VirginiaHenrico, Virginia

Customer Reviews

No reviews yet. Be the first to review Convert Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Convert Solar?

You can request a quote through the form on this page or contact Convert Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Convert Solar serve?

Convert Solar is based in Richmond and serves within a 150 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Convert Solar hold?

This profile lists the following reported certifications: NABCEP, Class A Contractor (VA). SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Convert Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Convert Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Convert Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Convert Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Convert Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2010
Employees11-50
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Convert Solar

Send your project details to request follow-up from Convert Solar. Response timing and consultation terms are set by the company.

For Convert Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
C

Convert Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.