C

Colorado Solar Co in Fort Collins

Fort Collins, Colorado·Solar Installation
Residential

3+ yrs

Experience

100 km

Service radius

2-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Colorado Solar Co

Northern Colorado solar installer providing residential solar systems with clean, precise installations since 2023

Fort Collins, Colorado 80549

Fort Collins, Colorado 80549

Services Offered

Solar InstallationSolar DesignGrid Connection

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

Colorado Contractor License

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Fort Collins, ColoradoWellington, ColoradoGreeley, ColoradoLoveland, ColoradoCheyenne, Colorado

Customer Reviews

No reviews yet. Be the first to review Colorado Solar Co!

Write a Review

Frequently Asked Questions

How do I get a quote from Colorado Solar Co?

You can request a quote through the form on this page or contact Colorado Solar Co directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Colorado Solar Co serve?

Colorado Solar Co is based in Fort Collins and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Colorado Solar Co hold?

This profile lists the following reported certifications: Colorado Contractor License. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Colorado Solar Co offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Colorado Solar Co for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Colorado Solar Co for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Colorado Solar Co handle permits and paperwork?

The exact scope is not verified on this profile. Ask Colorado Solar Co which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2023
Employees2-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Colorado Solar Co

Send your project details to request follow-up from Colorado Solar Co. Response timing and consultation terms are set by the company.

For Colorado Solar Co

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
C

Colorado Solar Co

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.