Coastal Solar Power in Savannah
15+ yrs
Experience
120 km
Service radius
11-50
Employees
Profile information
About Coastal Solar Power
Georgia-based solar installer serving Savannah and the coastal region with residential, commercial, and agricultural solar systems since 2011
Savannah, Georgia 31313
Savannah, Georgia 31313
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Coastal Solar Power!
Frequently Asked Questions
How do I get a quote from Coastal Solar Power?
You can request a quote through the form on this page or contact Coastal Solar Power directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Coastal Solar Power serve?
Coastal Solar Power is based in Savannah and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Coastal Solar Power hold?
This profile lists the following reported certifications: Georgia Grown Member. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Coastal Solar Power offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Coastal Solar Power for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Coastal Solar Power for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Coastal Solar Power handle permits and paperwork?
The exact scope is not verified on this profile. Ask Coastal Solar Power which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Coastal Solar Power
Send your project details to request follow-up from Coastal Solar Power. Response timing and consultation terms are set by the company.
For Coastal Solar Power
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Coastal Solar Power