CKR Solar in Birmingham
6+ yrs
Experience
200 km
Service radius
11-50
Employees
Profile information
About CKR Solar
Alabama's top-ranked solar installer specializing in custom solar-plus-storage systems with Tesla Powerwall
Birmingham, Alabama 35203
Birmingham, Alabama 35203
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review CKR Solar!
Frequently Asked Questions
How do I get a quote from CKR Solar?
You can request a quote through the form on this page or contact CKR Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does CKR Solar serve?
CKR Solar is based in Birmingham and serves within a 200 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does CKR Solar hold?
This profile lists the following reported certifications: Tesla Powerwall Certified Installer. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does CKR Solar offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask CKR Solar for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask CKR Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does CKR Solar handle permits and paperwork?
The exact scope is not verified on this profile. Ask CKR Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from CKR Solar
Send your project details to request follow-up from CKR Solar. Response timing and consultation terms are set by the company.
For CKR Solar
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
CKR Solar