C

Chroma Energy Group in Knoxville

Knoxville, Tennessee·Solar Installation
CommercialIndustrial

3+ yrs

Experience

300 km

Service radius

2-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Chroma Energy Group

NABCEP-certified solar EPC firm providing commercial, industrial, and utility-scale installations from Knoxville

Knoxville, Tennessee 37849

Knoxville, Tennessee 37849

Services Offered

Solar InstallationBattery StorageMaintenanceMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Knoxville, TennesseePowell, TennesseeNashville, TennesseeChattanooga, TennesseeOak Ridge, Tennessee

Customer Reviews

No reviews yet. Be the first to review Chroma Energy Group!

Write a Review

Frequently Asked Questions

How do I get a quote from Chroma Energy Group?

You can request a quote through the form on this page or contact Chroma Energy Group directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Chroma Energy Group serve?

Chroma Energy Group is based in Knoxville and serves within a 300 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Chroma Energy Group hold?

This profile lists the following reported certifications: NABCEP. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Chroma Energy Group offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Chroma Energy Group for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Chroma Energy Group for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Chroma Energy Group handle permits and paperwork?

The exact scope is not verified on this profile. Ask Chroma Energy Group which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2023
Employees2-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Chroma Energy Group

Send your project details to request follow-up from Chroma Energy Group. Response timing and consultation terms are set by the company.

For Chroma Energy Group

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
C

Chroma Energy Group

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.