C

Capital City Solar in Sacramento

Sacramento, California·Solar Installation
ResidentialCommercial

24+ yrs

Experience

1500+

Projects

100 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Capital City Solar

NABCEP-certified SunPower Elite dealer with over 1,500 local installations in the Sacramento region since 2002

Sacramento, California 95678

Sacramento, California 95678

Services Offered

Solar InstallationBattery StorageEV ChargingMaintenanceSolar Design

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPSunPower Elite DealerBBB A+CSLB Licensed

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SunPower

Inverters

SunPower

Batteries

Tesla

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Sacramento, CaliforniaRoseville, CaliforniaRocklin, CaliforniaLincoln, CaliforniaGranite Bay, CaliforniaFolsom, CaliforniaEl Dorado Hills, CaliforniaAuburn, California

Customer Reviews

No reviews yet. Be the first to review Capital City Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Capital City Solar?

You can request a quote through the form on this page or contact Capital City Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Capital City Solar serve?

Capital City Solar is based in Sacramento and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Capital City Solar hold?

This profile lists the following reported certifications: NABCEP, SunPower Elite Dealer, BBB A+, CSLB Licensed. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Capital City Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Capital City Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Capital City Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Capital City Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Capital City Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2002
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Capital City Solar

Send your project details to request follow-up from Capital City Solar. Response timing and consultation terms are set by the company.

For Capital City Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
C

Capital City Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.