Byrd on the Roof in Memphis
4+ yrs
Experience
120 km
Service radius
1-10
Employees
Profile information
About Byrd on the Roof
Published directory profile for Byrd on the Roof in Memphis. Verify services, credentials, ratings, and references directly with their original sources.
Memphis, Tennessee 38104
Memphis, Tennessee 38104
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Byrd on the Roof!
Frequently Asked Questions
How do I get a quote from Byrd on the Roof?
You can request a quote through the form on this page or contact Byrd on the Roof directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Byrd on the Roof serve?
Byrd on the Roof is based in Memphis and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Byrd on the Roof hold?
This profile lists the following reported certifications: GAF Certified, BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Byrd on the Roof offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Byrd on the Roof for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Byrd on the Roof for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Byrd on the Roof handle permits and paperwork?
The exact scope is not verified on this profile. Ask Byrd on the Roof which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Byrd on the Roof
Send your project details to request follow-up from Byrd on the Roof. Response timing and consultation terms are set by the company.
For Byrd on the Roof
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Byrd on the Roof