B

Bright World in Fresno

Fresno, California·Solar Installation
ResidentialCommercial

11+ yrs

Experience

150 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Bright World

Fresno-based solar and roofing company with in-house installation crews and offices across Central California

Fresno, California 93711

Fresno, California 93711

Services Offered

Solar InstallationBattery Storageroofing

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

Licensed Contractor

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

25yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Fresno, CaliforniaClovis, CaliforniaSan Jose, CaliforniaTurlock, CaliforniaModesto, California

Customer Reviews

No reviews yet. Be the first to review Bright World!

Write a Review

Frequently Asked Questions

How do I get a quote from Bright World?

You can request a quote through the form on this page or contact Bright World directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Bright World serve?

Bright World is based in Fresno and serves within a 150 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Bright World hold?

This profile lists the following reported certifications: Licensed Contractor. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Bright World offer?

This profile reports 25-year panel coverage and 25-year workmanship coverage. Ask Bright World for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Bright World for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Bright World handle permits and paperwork?

The exact scope is not verified on this profile. Ask Bright World which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2015
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Bright World

Send your project details to request follow-up from Bright World. Response timing and consultation terms are set by the company.

For Bright World

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
B

Bright World

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.