Bone Dry Solar in Indianapolis
4+ yrs
Experience
120 km
Service radius
51-200
Employees
Profile information
About Bone Dry Solar
Indianapolis's most reputable local solar company, backed by 30+ years of home improvement excellence from the Bone Dry family
Indianapolis, Indiana 46268
Indianapolis, Indiana 46268
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Bone Dry Solar!
Frequently Asked Questions
How do I get a quote from Bone Dry Solar?
You can request a quote through the form on this page or contact Bone Dry Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Bone Dry Solar serve?
Bone Dry Solar is based in Indianapolis and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Bone Dry Solar hold?
This profile lists the following reported certifications: Tesla Battery Certified, Tesla Solar Roof Certified, Owens Corning Approved. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Bone Dry Solar offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Bone Dry Solar for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Bone Dry Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Bone Dry Solar handle permits and paperwork?
The exact scope is not verified on this profile. Ask Bone Dry Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Bone Dry Solar
Send your project details to request follow-up from Bone Dry Solar. Response timing and consultation terms are set by the company.
For Bone Dry Solar
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Bone Dry Solar