Blue Raven Solar in Fort Collins
12+ yrs
Experience
200 km
Service radius
201-500
Employees
Profile information
About Blue Raven Solar
National solar installer with a dedicated Fort Collins office, installing Tier 1 monocrystalline panels since 2014
Fort Collins, Colorado 80526
Fort Collins, Colorado 80526
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Panels
Inverters
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Questions to Ask About Installation
Initial Consultation
Ask whether a site assessment is offered, what it covers, and whether it has a fee.
System Design
Request a design showing the proposed equipment, layout, assumptions, and itemized costs.
Permitting & Approval
Confirm who handles permits, inspections, and utility interconnection, and which fees are included.
Installation
Verify the installation team’s licenses, relevant certifications, and insurance.
Commissioning & Handover
Confirm the testing records, monitoring access, warranty registration, and support included in the handover.
Service Areas
Customer Reviews
No reviews yet. Be the first to review Blue Raven Solar!
Frequently Asked Questions
How do I get a quote from Blue Raven Solar?
You can request a quote through the form on this page or contact Blue Raven Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Blue Raven Solar serve?
Blue Raven Solar is based in Fort Collins and serves within a 200 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Blue Raven Solar hold?
This profile lists the following reported certifications: BBB A+ Rating, Colorado Electrical Contractor License. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Blue Raven Solar offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Blue Raven Solar for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Blue Raven Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Blue Raven Solar handle permits and paperwork?
The exact scope is not verified on this profile. Ask Blue Raven Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Blue Raven Solar
Send your project details to request follow-up from Blue Raven Solar. Response timing and consultation terms are set by the company.
For Blue Raven Solar
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Blue Raven Solar