B

Black Diamond Electric in Boise

Boise, Idaho·Solar Installation
ResidentialCommercial

8+ yrs

Experience

120 km

Service radius

1-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Black Diamond Electric

Full-service solar and electrical contractor owned by a master electrician, serving residential and commercial clients across Idaho

Boise, Idaho 83642

Boise, Idaho 83642

Services Offered

Solar InstallationBattery StorageSolar DesignEV ChargingGrid ConnectionMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

Master Electrician - IdahoLicensed in Idaho, Utah, Wyoming

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Tier-1 Solar Panels

Inverters

EnphaseSolarEdge

Batteries

Battery Storage

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Boise, IdahoMeridian, IdahoEagle, IdahoNampa, IdahoCaldwell, IdahoStar, IdahoKuna, Idaho

Customer Reviews

No reviews yet. Be the first to review Black Diamond Electric!

Write a Review

Frequently Asked Questions

How do I get a quote from Black Diamond Electric?

You can request a quote through the form on this page or contact Black Diamond Electric directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Black Diamond Electric serve?

Black Diamond Electric is based in Boise and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Black Diamond Electric hold?

This profile lists the following reported certifications: Master Electrician - Idaho, Licensed in Idaho, Utah, Wyoming. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Black Diamond Electric offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Black Diamond Electric for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Black Diamond Electric for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Black Diamond Electric handle permits and paperwork?

The exact scope is not verified on this profile. Ask Black Diamond Electric which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2018
Employees1-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Black Diamond Electric

Send your project details to request follow-up from Black Diamond Electric. Response timing and consultation terms are set by the company.

For Black Diamond Electric

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
B

Black Diamond Electric

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.