B

Big Dog Solar Energy in Boise

Boise, Idaho·Solar Installation
ResidentialCommercial

18+ yrs

Experience

200 km

Service radius

51-200

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Big Dog Solar Energy

Published directory profile for Big Dog Solar Energy in Boise. Verify services, credentials, ratings, and references directly with their original sources.

Boise, Idaho 83642

Boise, Idaho 83642

Services Offered

Solar InstallationBattery StorageSolar DesignEnergy AuditGrid ConnectionMaintenanceMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPBBB AccreditedUL Certified

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

REC

Inverters

SolarEdge

Batteries

LG ChemOutBack Power

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Boise, IdahoMeridian, IdahoNampa, IdahoTwin Falls, IdahoIdaho Falls, IdahoPocatello, IdahoEagle, Idaho

Customer Reviews

No reviews yet. Be the first to review Big Dog Solar Energy!

Write a Review

Frequently Asked Questions

How do I get a quote from Big Dog Solar Energy?

You can request a quote through the form on this page or contact Big Dog Solar Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Big Dog Solar Energy serve?

Big Dog Solar Energy is based in Boise and serves within a 200 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Big Dog Solar Energy hold?

This profile lists the following reported certifications: NABCEP, BBB Accredited, UL Certified. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Big Dog Solar Energy offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Big Dog Solar Energy for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Big Dog Solar Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Big Dog Solar Energy handle permits and paperwork?

The exact scope is not verified on this profile. Ask Big Dog Solar Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2008
Employees51-200
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Big Dog Solar Energy

Send your project details to request follow-up from Big Dog Solar Energy. Response timing and consultation terms are set by the company.

For Big Dog Solar Energy

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
B

Big Dog Solar Energy

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.