B

Baton Rouge Air in Baton Rouge

Baton Rouge, Louisiana·Solar Installation
ResidentialCommercial

32+ yrs

Experience

60 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Baton Rouge Air

Full-service electrical, HVAC, and solar company with over a decade of solar installation experience

Baton Rouge, Louisiana 70817

Baton Rouge, Louisiana 70817

Services Offered

Solar InstallationBattery StorageMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

Louisiana Licensed Contractor

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

Baton Rouge, LouisianaPrairieville, LouisianaGonzales, LouisianaDenham Springs, LouisianaCentral, Louisiana

Customer Reviews

No reviews yet. Be the first to review Baton Rouge Air!

Write a Review

Frequently Asked Questions

How do I get a quote from Baton Rouge Air?

You can request a quote through the form on this page or contact Baton Rouge Air directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Baton Rouge Air serve?

Baton Rouge Air is based in Baton Rouge and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Baton Rouge Air hold?

This profile lists the following reported certifications: Louisiana Licensed Contractor. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Baton Rouge Air offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Baton Rouge Air for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Baton Rouge Air for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Baton Rouge Air handle permits and paperwork?

The exact scope is not verified on this profile. Ask Baton Rouge Air which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded1994
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Baton Rouge Air

Send your project details to request follow-up from Baton Rouge Air. Response timing and consultation terms are set by the company.

For Baton Rouge Air

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
B

Baton Rouge Air

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.