A

Aviara Solar Contractors in San Diego

San Diego, California·Solar Installation
Residential

19+ yrs

Experience

80 km

Service radius

1-10

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Aviara Solar Contractors

Family-owned San Diego solar installer since 2007 offering discounted solar panel installations

San Diego, California 92020

San Diego, California 92020

Services Offered

Solar InstallationBattery StorageMaintenanceEnergy Auditroofing

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

CSLB Licensed

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

San Diego, CaliforniaEl Cajon, CaliforniaLa Jolla, CaliforniaCarlsbad, CaliforniaEncinitas, CaliforniaDel Mar, CaliforniaEscondido, CaliforniaRancho Santa Fe, California

Customer Reviews

No reviews yet. Be the first to review Aviara Solar Contractors!

Write a Review

Frequently Asked Questions

How do I get a quote from Aviara Solar Contractors?

You can request a quote through the form on this page or contact Aviara Solar Contractors directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Aviara Solar Contractors serve?

Aviara Solar Contractors is based in San Diego and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Aviara Solar Contractors hold?

This profile lists the following reported certifications: CSLB Licensed. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Aviara Solar Contractors offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Aviara Solar Contractors for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Aviara Solar Contractors for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Aviara Solar Contractors handle permits and paperwork?

The exact scope is not verified on this profile. Ask Aviara Solar Contractors which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2007
Employees1-10
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Aviara Solar Contractors

Send your project details to request follow-up from Aviara Solar Contractors. Response timing and consultation terms are set by the company.

For Aviara Solar Contractors

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
A

Aviara Solar Contractors

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.