A

Apollo Solar in El Paso

El Paso, Texas·Solar Installation
ResidentialCommercial

7+ yrs

Experience

80 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Apollo Solar

El Paso solar installer offering battery storage and panel installations with clear pricing and free quotes

El Paso, Texas 79901

El Paso, Texas 79901

Services Offered

Solar InstallationBattery StorageSolar Design

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB Accredited

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Questions to Ask About Installation

1

Initial Consultation

Ask whether a site assessment is offered, what it covers, and whether it has a fee.

2

System Design

Request a design showing the proposed equipment, layout, assumptions, and itemized costs.

3

Permitting & Approval

Confirm who handles permits, inspections, and utility interconnection, and which fees are included.

4

Installation

Verify the installation team’s licenses, relevant certifications, and insurance.

5

Commissioning & Handover

Confirm the testing records, monitoring access, warranty registration, and support included in the handover.

Service Areas

El Paso, TexasLas Cruces, TexasSocorro, TexasHorizon City, TexasCanutillo, Texas

Customer Reviews

No reviews yet. Be the first to review Apollo Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Apollo Solar?

You can request a quote through the form on this page or contact Apollo Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Apollo Solar serve?

Apollo Solar is based in El Paso and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Apollo Solar hold?

This profile lists the following reported certifications: BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Apollo Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Apollo Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Apollo Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Apollo Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Apollo Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2019
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Apollo Solar

Send your project details to request follow-up from Apollo Solar. Response timing and consultation terms are set by the company.

For Apollo Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
A

Apollo Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.